Skip to content

Analytics cookies

May we use cookies to see how this site is used? This includes recordings of visits, with everything you type hidden. If you reject, we only count visits, without cookies.May we use analytics cookies? Privacy policy

All industries
Chemicals

Same recipe, different batch.

In chemical plants, the same recipe gives a different batch depending on the shift and the raw material lot. Oppr puts the notes of the crew next to your process and lab data and proposes a cause of the variation. Your people confirm it, and the best method becomes the standard for every shift.

Plants we work with in this sector

  • Holliday Pigments

One process, a different answer per shift

  • When is the batch ready to filter?
  • Is this batch within spec, or do we correct?
  • Do you adjust the recipe for this raw material lot?
  • How do you clean the vessel between two products?
  • Do you wait for the lab, or carry on?

What keeps coming back

What keeps coming back in chemical plants.

Four problems we see in batch and continuous chemistry. Each one costs hours a year, and each one has a crew that already handles it better.

  1. Batch-to-batch variation

    Same recipe, same vessel, but a different cycle time and a different result per shift. A batch fails the lab check and needs a correction, a blend or rework. The batch record says what was planned, not what the crew did.

    Shows up as Longer cycle times and rework

  2. Raw materials that vary

    Every lot of raw material differs a little in purity, moisture or particle size. One crew adjusts for it at the start, another finds out at the lab check, hours later.

    Shows up as Off-spec batches and corrections

  3. Filtration, drying and separation

    Filters, centrifuges and dryers take longer after some batches. The separation step becomes the bottleneck of the line, and nobody can say in advance which batch it will be.

    Shows up as Bottleneck hours

  4. Cleaning between products

    Cleaning between two products or grades takes a different time per crew. Carry-over from the last product turns the first batch off-spec.

    Shows up as Downtime and off-spec

Input, process, output

Where we look for the root cause.

We start from the output, compare batches and runs, and trace the outliers back to the input or the process.

  1. Input

    What comes in

    Raw material lots, solvents and additives, each with its own purity and moisture.

  2. Process

    What happens

    Machines
    Reactors, filters, centrifuges and dryers, with their temperatures, pressures and cycle times.
    Crew
    Charging, dosing, timing and the corrections each shift makes.
  3. Output

    What goes out

    Lab results on purity, viscosity or particle size, and the batches that go off-spec.

One example, three steps Example

A filter press that keeps running long.

Filter press FP-201

  1. 01

    Identify

    What happened?

    The operator records a voice note at the filter press. It lands on the timeline next to the temperature and the pressure of that batch.

    03:10 · Voice note · 0:14

    “Filtration slow again. The cake stays wet.”

  2. 02

    Analyze

    Why does it keep happening?

    Practical AI finds the pattern: the slow cycles follow the batches that precipitated at the top of the range. Your process engineers confirm it.

    Cause

    On some batches the precipitation runs too hot. The particles come out finer and the cake filters slowly.

    18 h a year

  3. 03

    Realize

    Does everyone use the best method?

    The tested range goes into the standard work as a new version. Every shift reads it on the phone, at the vessel.

    Standard work · Filter press FP-201

    3. Precipitate at 60 to 70 °C.

    3. Precipitate at 60 to 64 °C. Check the temperature after 15 minutes.

    Published

The asset, the notes and the numbers are an example. The three steps are the ones we follow with every plant.

Next to the systems you have

Start from the data you already have.

A local extract is usually enough to start. No new hardware and no long IT project. Oppr adds what the crew saw, next to what the machines measured.

  • The phone of the operator
  • DCS or PLC, and the historian
  • Batch records in MES or ERP
  • Lab results, from LIMS or a spreadsheet
  • Shift reports and Excel files

In your words

The terms we use with your team.

Batch record
What was planned and recorded for a batch. Oppr adds what the crew saw and did, at the moment it happened.
Off-spec
Product outside its specification. Oppr links each off-spec batch to the notes and the data of that batch.
Cycle time
The time a batch takes from charging to discharge. The spread between shifts is where the hours go.
Golden batch
The best run of a recipe, used as the reference. Oppr helps find out what the crew did differently on that run.
Carry-over
Residue of the last product that ends up in the next one. It decides how long cleaning between products has to take.

Questions

What chemical plants ask us.

All questions about Oppr

Does Oppr work for batch processes?

Yes. Each batch gets its own stretch on the timeline, with the notes of the crew, the lab results and the process data. Batches of the same recipe can be compared side by side, so you see where they part.

We work under GMP or ISO. Does Oppr replace our quality system?

No. Your quality system and your approval flow stay. Oppr gives it the tested improvement, and a new version of the standard work goes through your own approval.

Do we need a LIMS?

No. Lab results in a spreadsheet are enough to start. Oppr puts them on the timeline, next to the batch they belong to.

Where do we start?

With one problem on one line that keeps coming back, such as a batch that runs long or a correction that keeps returning. In about ten weeks you get its cause and its hours a year, confirmed by your people.

Which problem keeps coming back in your plant?

Tell us. We start there, on one production line, with your people.

  1. 1Pick your problem. Tell us which problem keeps coming back and takes capacity from your line.
  2. 2We connect the data. We use the logs you already have and set up the app for the floor.
  3. 3Your 10-week sprint starts. You see where waste and downtime happen, and what each cause costs per year.

Or write to info@oppr.ai