Same machine, different scrap rate.
In plastics and rubber plants, the same machine and the same material give a different result per crew. Oppr puts what operators see next to your machine data and proposes a cause of the scrap and stops. Your people confirm it, and the best setting becomes the standard for every shift.
Plants we work with in this sector
One process, a different answer per shift
- When is the melt right?
- Is this colour difference acceptable?
- When do you change the screen?
- How much regrind can go in?
- How many parts do you scrap after a start-up?
What keeps coming back
What keeps coming back in plastics and rubber.
Four problems we see on extrusion, compounding and moulding lines. Each one costs hours or material, and each one has a crew that already handles it better.
Start-up scrap after a changeover
After a mould change, a colour change or a stop, each crew starts up its own way. One crew is in spec after ten minutes, another after forty.
Shows up as Scrap and lost hours
Screen changes and pressure build-up
The melt pressure rises and the screen has to be changed. Some lots of material need it far more often, and the crew finds out on the line.
Shows up as Unplanned stops
Colour and surface defects
Specks, gels, streaks or a shade that drifts. The product is rejected at the end of the line, hours after the cause.
Shows up as Rejects and rework
Material variation
Recyclate, regrind and moisture differ per lot. Drying and dosing are set per crew, so the same lot runs well on one shift and badly on the next.
Shows up as Process drift
Input, process, output
Where we look for the root cause.
We start from the output, compare batches and runs, and trace the outliers back to the input or the process.
Input
What comes in
Polymer, masterbatch, regrind and recyclate, each lot with its own moisture and melt flow.
Process
What happens
- Machines
- Dryers, extruders and presses, with their temperatures, pressures and speeds.
- Crew
- Start-ups, screen changes and the settings each crew adjusts by hand.
Output
What goes out
Scrap and rejects, and the checks on colour and dimensions.
One example, three steps Example
An extruder that keeps needing a screen change.
Extruder EX-3
- 01
Identify
What happened?
The operator records a voice note at the extruder. It lands on the timeline next to the melt pressure and the lot number.
22:35 · Voice note · 0:11
“Pressure up again after the new recyclate lot. Changed the screen early.”
- 02
Analyze
Why does it keep happening?
Practical AI finds the pattern: the early screen changes follow the hours when the dryer hopper ran low. Your process engineers confirm it.
Cause
When the hopper runs low, the recyclate goes in with too little drying time. The moisture raises the pressure at the screen.
16 h a year
- 03
Realize
Does everyone use the best method?
The tested setting goes into the standard work as a new version. Every crew reads it on the phone, at the extruder.
Standard work · Extruder EX-3
2. Dry the recyclate at 80 °C.2. Dry the recyclate for at least 3 hours at 80 °C. Keep the hopper above the mark.
Published
The asset, the notes and the numbers are an example. The three steps are the ones we follow with every plant.
Next to the systems you have
Start from the data you already have.
A local extract is usually enough to start. No new hardware and no long IT project. Oppr adds what the crew saw, next to what the machines measured.
- The phone of the operator
- Machine PLCs and the historian
- MES, or the reject and stop log
- Quality checks and the lab
- ERP, lot numbers and Excel files
In your words
The terms we use with your team.
- Start-up scrap
- The product made between a start-up and the first part in spec. It shows how differently crews start a machine.
- Screen change
- Replacing the screen pack in front of the die when the melt pressure gets too high. How often it is needed says a lot about the material.
- Regrind and recyclate
- Ground-up own scrap and recycled material that go back into the process. They vary per lot, so the settings have to follow.
- Melt pressure
- The pressure of the molten material in front of the screen or the die. A rising trend is often the first sign of a problem.
- Cycle time
- The time of one moulding cycle. A crew that shortens it by hand often trades it for rejects.
Does Oppr work for injection moulding as well as extrusion?
Yes. Both repeat the same process thousands of times, so small differences between crews add up. Oppr compares runs of the same product and material, whatever the machine.
Our machines already log their data. What does Oppr add?
What the crew saw and did. The machine data shows that the pressure rose. The note of the operator says which lot was in the hopper and what the crew changed.
Does Oppr rate our operators?
No. Oppr looks at the process, never at who was on shift. Nobody is scored or ranked.
Where do we start?
With one problem on one line that keeps coming back, such as start-up scrap after a colour change. In about ten weeks you get its cause and its hours a year, confirmed by your people.
Other industries
See how it worksChemicals
Batch and continuous chemistry, including fine and speciality chemicals: batch variation, raw materials, separation and cleaning.
Read moreRecycling and waste to energy
Sorting lines, shredders and waste-to-energy plants: jams, varying input, output quality and fouling.
Read moreFood, beverage and feed
Processing and packing lines and feed mills: changeovers and cleaning, giveaway, small stops and variation between shifts.
Read more

Which problem keeps coming back in your plant?
Tell us. We start there, on one production line, with your people.
- 1Pick your problem. Tell us which problem keeps coming back and takes capacity from your line.
- 2We connect the data. We use the logs you already have and set up the app for the floor.
- 3Your 10-week sprint starts. You see where waste and downtime happen, and what each cause costs per year.
Or write to info@oppr.ai
