Skip to content

Analytics cookies

May we use cookies to see how this site is used? This includes recordings of visits, with everything you type hidden. If you reject, we only count visits, without cookies.May we use analytics cookies? Privacy policy

All industries
Recycling and waste to energy

Every load is different. The stops are not.

In recycling and waste-to-energy plants, the input changes every day, but the same stops keep coming back. Operators handle each load with many small actions during the shift, and those actions hold what they know. Oppr records what the crew sees and does next to your process data and proposes a cause. Your people confirm it, and the best way of working becomes the standard for every shift.

Plants we work with in this sector

  • Attero

One process, a different answer per shift

  • Can this load go in, or do we set it aside?
  • When do you clear the shredder?
  • When do you clean the screen?
  • How do you mix the bunker?
  • Do you lower the feed rate, or keep going?

What keeps coming back

What keeps coming back in recycling and waste to energy.

Four problems we see on sorting lines and in waste-to-energy plants. Each one costs hours or capacity, and each one has a crew that already handles it better.

  1. Jams and blockages

    Shredders, conveyors and chutes block on the same kinds of material. The crew clears it, and the next week it happens again.

    Shows up as Unplanned stops

  2. Varying input

    Every load is different, so the crew adjusts all shift long: mixing the bunker, slowing the feed, pulling material out. Those small actions hold the know-how of the operators, but nobody records them, so every crew does it its own way.

    Shows up as An unstable process

  3. Output quality and contamination

    The output fails its purity spec, or the buyer rejects bales. The cause sits hours earlier on the line.

    Shows up as Lower revenue and rework

  4. Fouling and wear

    Boilers foul, screens clog and wear parts fail earlier than planned. Some ways of running the plant speed it up.

    Shows up as Lost capacity and maintenance

Input, process, output

Where we look for the root cause.

We start from the output, compare batches and runs, and trace the outliers back to the input or the process.

  1. Input

    What comes in

    Loads that differ every day in material, moisture and contamination.

  2. Process

    What happens

    Machines
    Shredders, screens and sorters, or the furnace and the boiler, with their currents, temperatures and feed rates.
    Crew
    Mixing the bunker, feeding the line, clearing jams and the many small actions of each shift.
  3. Output

    What goes out

    Purity of the output, bales accepted or rejected, throughput and emissions.

One example, three steps Example

A shredder that keeps jamming.

Shredder SH-1

  1. 01

    Identify

    What happened?

    The operator records a voice note and a photo of the load. It lands on the timeline next to the motor current and the feed rate.

    14:20 · Voice note · 0:09

    “Shredder jammed again. A lot of film and rope in this load.”

  2. 02

    Analyze

    Why does it keep happening?

    Practical AI finds the pattern: the jams follow loads with film or rope that went in at full feed rate. Your maintenance and process people confirm it.

    Cause

    Long, stringy material at full feed rate wraps around the rotor.

    20 h a year

  3. 03

    Realize

    Does everyone use the best method?

    The tested way of feeding goes into the standard work as a new version. Every crew reads it on the phone, at the feed.

    Standard work · Shredder SH-1

    1. Feed at full rate.

    1. With film or rope in the load, feed at 70% and clear the rotor at the end of the load.

    Published

The asset, the notes and the numbers are an example. The three steps are the ones we follow with every plant.

Next to the systems you have

Start from the data you already have.

A local extract is usually enough to start. No new hardware and no long IT project. Oppr adds what the crew saw, next to what the machines measured.

  • The phone of the operator
  • DCS or SCADA, and the historian
  • Weighbridge and acceptance records
  • The stop log and the maintenance system (CMMS)
  • Quality and emission measurements, Excel files

In your words

The terms we use with your team.

Throughput
Tonnes per hour through the line or the furnace. Stops and a lowered feed rate both eat into it.
Bunker mixing
How the crane operator mixes the waste in the bunker before it goes in. It decides how even the input is.
Purity
The share of the target material in an output stream. The buyer pays for it, and contamination lowers it.
Fouling
Deposits on boiler tubes or screens that lower the heat transfer or the throughput. How the plant is run speeds it up or slows it down.
Availability
The share of planned time that the line or the furnace actually runs. Repeat stops are where it goes.

Questions

What recycling and waste-to-energy plants ask us.

All questions about Oppr

Our input changes every day. Is there still a cause to find?

Yes. That is why the notes of the crew matter: they record what was in the load, which no sensor sees. Next to the process data, the pattern behind the stops shows up.

Does Oppr work in a waste-to-energy plant too?

Yes. Waste to energy is a continuous process with a varying input, a lot of data and crews that each run it their own way. That is where Oppr fits.

Do we need new sensors?

No. Oppr starts from the data you already have and the phone the crew already carries.

Does Oppr replace our maintenance system?

No. Oppr builds on top of your CMMS and your other systems. It adds what the crew saw, next to the stop.

Which problem keeps coming back in your plant?

Tell us. We start there, on one production line, with your people.

  1. 1Pick your problem. Tell us which problem keeps coming back and takes capacity from your line.
  2. 2We connect the data. We use the logs you already have and set up the app for the floor.
  3. 3Your 10-week sprint starts. You see where waste and downtime happen, and what each cause costs per year.

Or write to info@oppr.ai